Difference between revisions of "General Analysis"
From EUDP
Line 1: | Line 1: | ||
− | A new, not yet included in the diagram below, activity has been developed. The [[System Overview | + | A new, not yet included in the diagram below, activity has been developed. The [[System Overview Diagram]] (SOD). The SOD is typically drawn as the first part of the [[Requirements Analysis]] Process. |
<imagemap> | <imagemap> |
Revision as of 16:48, 27 September 2010
A new, not yet included in the diagram below, activity has been developed. The System Overview Diagram (SOD). The SOD is typically drawn as the first part of the Requirements Analysis Process.